VUSD Vista Academy of Performing Arts Upgrade Theater

Vista Unified School District reached out when their performing arts theater was in need of repairs. Firestone's scope of work was to demo out the existing flooring throughout the theater and control room. Along with the removal of the outdated lighting, sound fixtures and controls. Once all the equipment was removed and disposed of, Firestone painted the exterior walls of the performing arts theater and also installed new flooring throughout the theater. 

After Photos

During Photos

Before Photos

Share by: