Vista Adult Transitional Center Plumbing Repair

Firestone was notified of an underground water line leaking and we quickly traced the leak to find a pinhole due to deteriorated copper. We excavated around the area of the leak to expose the pipe, due to the condition of the pipe we replaced the entire length of the pipe to prevent new leaks from forming. after the water line was replaced we tested our new line under pressure and backfilled the trench. After the line was tested and the trench was backfilled, we replaced the concrete sections that were damaged from the leaking water. 

After Construction

During Construction

Share by: